THE ARC

ARCHITECTS

Asymptote +이가건축

시공사

대림산업

DFMA 솔루션

CNC TWISTED TUBE

준공

2012년

3D 엔지니어링

We were called in when the project was 7 months into completion. In order to schedule the construction, the ETFE panel had to be built first, and precise steel construction had to be done. We applied the CNC twisted tube system to construct a preform structure with a construction error of less than 3mm, and installed the ETFE correctly