top of page
Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
Seosuwon Chilbo Gymnasium
설계사
무영건축
시공사
성토건설
DfMA 솔루션
CNC T-BAR 시스템
준공
2016년
We participated in the construction phase as an façade engineer. CNC T-Bar system is used for two curved surface, and CNC plate system which is less than T-bar for roof sections. Initially, problem arose where the gap between the façade and the infrastructure was not constant in the previous design, but it was solved by applying Digital Fabrication Solution of WITHWORKS.
bottom of page